skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Series capacitor installations in the B. C. Hydro 500 kV system. [British Columbia]

Conference · · IEEE Trans. Power Appar. Syst.; (United States)
OSTI ID:5227125
 [1]; ;
  1. B. C. Hydro and Power Authority, Vancouver

A description is given of the series capacitors installed in the 500 kV 580 mile long Peace River transmission system in British Columbia, Canada. The installations feature one of the world's biggest banks (1012 MVAR installed capacity), internally fused capacitors, and electronic control systems. The aspects discussed are general design features, protection and control functions, commissioning tests and staged fault tests. Recent operating experience with these stations is also submitted. The information given here would be valuable for utility planners considering series compensation.

OSTI ID:
5227125
Journal Information:
IEEE Trans. Power Appar. Syst.; (United States), Vol. PAS-96:6; Conference: IEEE PES winter meeting, New York, NY, USA, 30 Jan 1977
Country of Publication:
United States
Language:
English