skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam 2008-2009

Technical Report ·
DOI:https://doi.org/10.2172/982964· OSTI ID:982964

This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam (TDA) sluiceway and turbines during fall/winter 2008 and early spring 2009, respectively. The study was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE). Operating the sluiceway reduces the potential for hydropower production. However, this surface flow outlet may be the optimal non-turbine route for fallbacks in late fall after the sluiceway is typically closed for juvenile fish passage and for overwintering summer steelhead and kelt passage in the early spring before the start of the voluntary spill season. The goal of this study was to characterize adult steelhead spatial and temporal distributions and passage rates at the sluiceway and turbines, and their movements in front of the sluiceway at TDA to inform fisheries managers’ and engineers’ decision-making relative to sluiceway operations. The study periods were from November 1 to December 15, 2008 (45 days) and from March 1 to April 9, 2009 (40 days). The study objectives were to 1) estimate the number and distribution of overwintering summer steelhead fallbacks and kelt-sized acoustic targets passing into the sluiceway and turbines at TDA during the two study periods, respectively, and 2) assess the behavior of these fish in front of sluice entrances. We obtained fish passage data using fixed-location hydroacoustics and fish behavior data using acoustic imaging. For the overwintering summer steelhead, fallback occurred throughout the 45-day study period. We estimated that a total of 1790 ± 250 (95% confidence interval) summer steelhead targets passed through the powerhouse intakes and operating sluices during November 1 to December 15, 2008. Ninety five percent of these fish passed through the sluiceway. Therefore, without the sluiceway as a route through the dam, a number of steelhead may have fallen back through turbines. Run timing peaked in late November, but fish continued to pass the dam until the end of the study. Horizontal distribution data indicated that sluice 1 is the preferred route for these fish during fallback through the dam. Diel distribution for overwintering steelhead fallbacks was variable with no apparent distinct patterns. Therefore, sluiceway operations should not be based on diel distribution. For the early spring study, overwintering summer steelhead and early out-migrating steelhead kelt downstream passage occurred throughout the 40-day study period. A total of 1766 ± 277 (95% confidence interval) kelt-size targets were estimated to have passed through the powerhouse intakes and operating sluices. Ninety five percent of these fish passed through the sluiceway. Therefore, as with steelhead fallback, not having the sluiceway as a route through the dam, a number of overwintering steelhead and kelts may use the turbines for downstream passage before the start of the spill season. Run timing peaked in late March; however, relatively large numbers of kelt-sized targets passed the dam on March 2 and March 6 (162 and 188 fish, respectively). Horizontal distribution indicated that sluice 1 is the preferred route for these adult salmonids as they migrate downstream through the dam. Again, no clear pattern was seen for diel distribution of overwintering steelhead and early out-migrating kelt passage.

Research Organization:
Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
982964
Report Number(s):
PNNL-18590; 400403209; TRN: US1004541
Country of Publication:
United States
Language:
English