skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Longitudinal tracking studies for the AHF booster synchrotron

Conference ·

The greenfield site option for the Advanced Hydrotest Facility (AHF) contains a 157-MeV H- linac followed by two synchrotrons, a booster and a 50-GeV main ring. Several different lattice designs are under consideration for the main ring while two different booster designs are presently being studied. The first booster is a 4-GeV synchrotron operating at h=1 with a 5-Hz cycle. The second is a 9-GeV machine operating at h=2 with a 1-Hz cycle. Both designs are required to deliver {approx}3 x 1012 p/bunch. A longitudinal painting scheme was employed during injection to enhance beam quality and capture during the initial portion of the ramp. The longitudinal beam dynamics simulations were performed with the tracking code ESME. The purpose of these studies was to investigate parameter space and obtain estimates for the rf system requirements. This paper presents the results of these studies.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE
OSTI ID:
976626
Report Number(s):
LA-UR-03-2863; TRN: US1006498
Resource Relation:
Journal Volume: 3; Conference: Submitted to: 2003 Particle Accelerator Conference (PAC2003), Portland, OR, May 12-16, 2003
Country of Publication:
United States
Language:
English

Similar Records

KEK fast cycling booster
Conference · Wed Jun 01 00:00:00 EDT 1977 · IEEE Trans. Nucl. Sci.; (United States) · OSTI ID:976626

NSLS-II Booster Design
Technical Report · Mon Nov 16 00:00:00 EST 2009 · OSTI ID:976626

Synchronous Transfer of Beam from the NAL Fast Cycling Booster Synchrotron to the NAL Main Ring System.
Conference · Mon Jan 01 00:00:00 EST 1973 · IEEE Trans.Nucl.Sci. · OSTI ID:976626