Independent Verification Final Summary Report for the David Witherspoon, Inc. 1630 Site Knoxville, Tennessee
The primary objective of the independent verification was to determine if BJC performed the appropriate actions to meet the specified “hot spot” cleanup criteria of 500 picocuries per gram (pCi/g) uranium-238 (U-238) in surface soil. Specific tasks performed by the independent verification team (IVT) to satisfy this objective included: 1) performing radiological walkover surveys, and 2) collecting soil samples for independent analyses. The independent verification (IV) efforts were designed to evaluate radioactive contaminants (specifically U-238) in the exposed surfaces below one foot of the original site grade, given that the top one foot layer of soil on the site was removed in its entirety.
- Research Organization:
- Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- DE-AC05-06OR23100
- OSTI ID:
- 959411
- Report Number(s):
- ORISE 0465-SR-05-0; TRN: US0904409
- Country of Publication:
- United States
- Language:
- English
Similar Records
Letter Report - Verification Survey of Final Grids at the David Witherspoon, Inc. 1630 Site Knoxville, Tennessee
Interim Letter Report - Verification Survey of Partial Grids H19, J21, J22, X20, and X21 at the David Witherspoon, Inc. 1630 Site, Knoxville Tennessee
Interim Letter Report - Verification Survey of Partial Grid E9, David Witherspoon, Inc. 1630 Site Knoxville, Tennessee
Technical Report
·
Tue Feb 17 00:00:00 EST 2009
·
OSTI ID:959411
Interim Letter Report - Verification Survey of Partial Grids H19, J21, J22, X20, and X21 at the David Witherspoon, Inc. 1630 Site, Knoxville Tennessee
Technical Report
·
Wed Mar 19 00:00:00 EDT 2008
·
OSTI ID:959411
Interim Letter Report - Verification Survey of Partial Grid E9, David Witherspoon, Inc. 1630 Site Knoxville, Tennessee
Technical Report
·
Thu Jun 12 00:00:00 EDT 2008
·
OSTI ID:959411