Title: Mechanical Devices Readiness FY04.0402.3

Technical Report ·
DOI:https://doi.org/10.2172/952461· OSTI ID:952461

This project funded production process and tooling improvements to meet and sustain rate production for the W76-1 mechanism assemblies. Techniques were developed to allow evaluation and disposition of sealed stronglinks that resulted in prevention of the scrapping of numerous stronglinks and firesets. Improved processes and tooling allowed D-Test rates to be reduced in favor of E-Test, thus saving millions of dollars over the life of the program. Future system mechanisms will likely be smaller with tighter toleranced parts that will require improved inspection equipment and techniques. During the latter phase of this project, a method of improving inspection was developed that will have benefits for existing and future system mechanical assemblies.

Research Organization:
Kansas City Plant (KCP), Kansas City, MO
Sponsoring Organization:
USDOE National Nuclear Security Administration (NA)
DOE Contract Number:
DE-AC04-01AL66850
OSTI ID:
952461
Report Number(s):
KCP-613-8507; TRN: US200913%%581