Title: Remaining Sites Verification Package for the 100-F-46, 119-F Stack Sampling French Drain, Waste Site Reclassification Form 2008-021

Technical Report ·
DOI:https://doi.org/10.2172/944168· OSTI ID:944168

The 100-F-46 french drain consisted of a 1.5 to 3 m long, vertically buried, gravel-filled pipe that was approximately 1 m in diameter. Also included in this waste site was a 5 cm cast-iron pipeline that drained condensate from the 119-F Stack Sampling Building into the 100-F-46 french drain. In accordance with this evaluation, the confirmatory sampling results support a reclassification of this site to No Action. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of confirmatory sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

Research Organization:
Washington Closure Hanford
Sponsoring Organization:
USDOE
DOE Contract Number:
DE-AC06-05RL14655
OSTI ID:
944168
Report Number(s):
RSVP-2008-021; TRN: US0900660
Country of Publication:
United States
Language:
English