Power coupler for the ILC crab cavity
Conference
·
· Conf.Proc.C070625:2212,2007
The ILC crab cavity will require the design of an appropriate power coupler. The beam-loading in dipole mode cavities is considerably more variable than accelerating cavities, hence simulations have been performed to establish the required external Q. Simulations of a suitable coupler were then performed and were verified using a normal conducting prototype with variable coupler tips.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 922017
- Report Number(s):
- FERMILAB-CONF-07-471-E; TRN: US0801081
- Journal Information:
- Conf.Proc.C070625:2212,2007, Conference: Presented at Particle Accelerator Conference (PAC 07), Albuquerque, New Mexico, 25-29 Jun 2007
- Country of Publication:
- United States
- Language:
- English
Similar Records
Copper Prototype Measurements of the HOM, LOM and SOM Couplers for the ILC Crab Cavity
Copper Prototype Measurements of the HOM, LOM And SOM Couplers for the ILC Crab Cavity
Status of the ILC Crab Cavity Development
Conference
·
Mon Jun 23 00:00:00 EDT 2008
· Conf.Proc.C0806233:mopp009,2008
·
OSTI ID:922017
+5 more
Copper Prototype Measurements of the HOM, LOM And SOM Couplers for the ILC Crab Cavity
Conference
·
Fri Nov 04 00:00:00 EDT 2011
· Conf.Proc.C0806233:mopp009,2008
·
OSTI ID:922017
+5 more
Status of the ILC Crab Cavity Development
Conference
·
Thu Oct 20 00:00:00 EDT 2011
·
OSTI ID:922017
+6 more