Title: 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

Abstract

This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.

Authors:
Publication Date:
Research Org.:
Idaho National Laboratory - Idaho Closure Project
Sponsoring Org.:
USDOE
OSTI Identifier:
909860
Report Number(s):
DOE/ID-11275
TRN: US0703925
DOE Contract Number:  
DE-AC0705ID14516
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; INEEL; MONITORING; STORAGE FACILITIES; RADIOACTIVE WASTE STORAGE; SETTLING PONDS; INSPECTION; Operable Unit 3-13, Group 1 Tank Farm Interim Action

Citation Formats

Shanklin, D. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action. United States: N. p., 2006. Web. doi:10.2172/909860.
Shanklin, D. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action. United States. https://doi.org/10.2172/909860
Shanklin, D. 2006. "2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action". United States. https://doi.org/10.2172/909860. https://www.osti.gov/servlets/purl/909860.
@article{osti_909860,
title = {2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action},
author = {Shanklin, D},
abstractNote = {This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.},
doi = {10.2172/909860},
url = {https://www.osti.gov/biblio/909860}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jul 19 00:00:00 EDT 2006},
month = {Wed Jul 19 00:00:00 EDT 2006}
}