skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: North RTL 'Grid Scan' Studies

Technical Report ·
DOI:https://doi.org/10.2172/900236· OSTI ID:900236

This study was made in response to screen measurements which indicated an emittance growth of nearly a factor of two within the North RTL or linac girder-1. Betatron oscillations are induced at the beginning of the North RTL to search for gross geometric aberrations arising within the RTL or sector-2 of the linac. The oscillations are induced horizontally and vertically with two X or two Y dipole correctors stepped in a nested loop fashion. In both cases the full set of RTL and first girder sector-2 linac beam position monitors (BPMs) are sampled in X and Y for each corrector setting. Horizontal (or vertical) data from pairs of BPMs are then transformed to phase space coordinates by the linear transformation constructed assuming the transport optics between the BPMs is known. A second transformation is then made to normalized phase space coordinates by using Twiss parameters consistent with the assumed transport optics. By careful choice of initial Twiss parameters the initial grid can be made square for convenience in graphical interpretation. A linear ''grid'' is then fitted to the transformed data points for each pair of BPMs. The area of each grid is calculated and linearity qualitatively evaluated. Furthermore, although not the focus of this study, the beta match at each BPM can be quantified.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76SF00515
OSTI ID:
900236
Report Number(s):
SLAC-TN-07-003; TRN: US0703555
Country of Publication:
United States
Language:
English

Similar Records

North RTL grid scan'' studies
Technical Report · Wed Oct 17 00:00:00 EDT 1990 · OSTI ID:900236

Finding beam loss locations in a linac with oscillating dipole correctors
Technical Report · Wed May 01 00:00:00 EDT 2019 · OSTI ID:900236

RHIC VERTICAL AC DIPOLE COMMISSIONING.
Conference · Sun Jun 02 00:00:00 EDT 2002 · OSTI ID:900236