The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.
- Research Organization:
- Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC05-76RL01830
- OSTI ID:
- 898098
- Report Number(s):
- PNNL-16340; 830403000; TRN: US0701564
- Country of Publication:
- United States
- Language:
- English
Similar Records
TREATABILITY TEST REPORT FOR THE REMOVAL OF CHROMIUM FROM GROUNDWATER AT 100-D AREA USING ELECTROCOAGULATION
Pilot-scale treatability test plan for the 200-BP-5 operable unit
Related Subjects
54 ENVIRONMENTAL SCIENCES
HANFORD RESERVATION
GROUND WATER
REMEDIAL ACTION
COLUMBIA RIVER
URANIUM
ENVIRONMENTAL TRANSPORT
STRONTIUM 90
CARBON TETRACHLORIDE
CHLOROFORM
CHROMIUM
GEOCHEMISTRY
BIOREMEDIATION
QUALITY ASSURANCE
groundwater remediation
Hanford Site
Columbia River Protection Supplemental Technologies Project