Beam Physics for the 12 GeV CEBAF Upgrade Project
Beam physics aspects of the 12 GeV Upgrade of CEBAF are presented. The CEBAF Upgrade to 12 GeV is achieved via 5.5 recirculations through the linacs, and the installation of 10 new high-gradient cryomodules. A new experimental hall, Hall D, is envisioned at the end of North Linac. Simulation results for straight-through and recirculated injectors are summarized and compared. Beam transport designs are discussed and evaluated with respect to matching and beam breakup (BBU) optimization. Effects of synchrotron radiation excitation on the beam properties are calculated. BBU simulations and derived specifications for the damping of higher order modes of the new 7-cell cavities are presented. The energies that provide longitudinal polarization in multiple experimental halls simultaneously are calculated. Finally, a detailed optics design for the Hall D transport line has been obtained.
- Research Organization:
- Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
- Sponsoring Organization:
- USDOE - Office of Energy Research (ER)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 861031
- Report Number(s):
- JLAB-ACP-05-418; DOE/ER/40150-3645; TRN: US0600231
- Resource Relation:
- Conference: PAC 2005, 16-20 May 2005, Knoxville, Tennessee
- Country of Publication:
- United States
- Language:
- English
Similar Records
Upgrading the CEBAF Accelerator to 12 GeV
Recirculating Beam Breakup Study for the 12 GeV Upgrade at Jefferson Lab