skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Maximum Beam Power and Nominal Beam Losses at S-20

Technical Report ·
DOI:https://doi.org/10.2172/839690· OSTI ID:839690

The maximum credible beam power values for electrons shown in Table 1 for e{sup -} beams are based on a beam power of 1.8 MW (1.875 x 10{sup 12} e{sup -} at 120 Hz) for an energy of 50 GeV at S-30. Positrons are limited by the positron source damage threshold to an average current of {approx}2 {mu}A, i.e., {approx}10{sup 11} e{sup -} per pulse at 120 Hz on the target [1]. The ratio of e{sup +} at S-1 per e{sup -} on the conversion target is {ge}2. At S-20 the maximum linac energy is 33 GeV, while the HER and LER Bypass beams are limited to 12 and 4 GeV respectively by the BCS.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-76SF00515
OSTI ID:
839690
Report Number(s):
SLAC-TN-05-030; TRN: US0503533
Country of Publication:
United States
Language:
English

Similar Records

The SLAC Linac During the PEP-II Era
Technical Report · Wed Apr 07 00:00:00 EDT 1999 · OSTI ID:839690

Radiological Environmental Protection for PEP-II Ring High Luminosity Operation
Conference · Wed Aug 16 00:00:00 EDT 2006 · OSTI ID:839690

Injection, Positron and Electron Beam Generation
Conference · Tue Dec 01 00:00:00 EST 1987 · OSTI ID:839690