BWR Vessel and Internals Project Removal and Analysis of Material Samples from Core Shroud and Top Guide at Susquehanna Unit 2
Fast and thermal fluence were determined by a laboratory analysis of the samples. Fluence in the upper regions of the shroud (between the H1 and H2 welds) was substantially lower than that in the belt line region (near the H4 weld). Fluence in the top guide was significantly higher than fluence on the core shroud. As expected, helium concentrations were highest in regions where fluence was highest. Estimates of the initial boron concentration were similar to measurements made on materials removed from other reactors. A technical justification evaluated the acceptability of the sampling process with respect to structural consequences of material removal and to increased cracking susceptibility due to the as-left condition. It was determined that the sampling process was acceptable on both counts.
- Research Organization:
- Electric Power Research Institute (US)
- Sponsoring Organization:
- USDOE Office of Nuclear Energy, Science and Technology (NE) (US)
- DOE Contract Number:
- FC07-00NE22796
- OSTI ID:
- 839512
- Report Number(s):
- 1012016; TRN: US200509%%836
- Resource Relation:
- Other Information: PBD: 15 Apr 2005
- Country of Publication:
- United States
- Language:
- English