Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-120 Hanford-Ostrander Corridor Maintenance
- Bonneville Power Administration (BPA), Portland, OR (United States)
Vegetation Management for the Hanford-Ostrander Transmission Line Corridor from Tower 10/4 to Tower 17/2 + 770. The line is a 500kV Single Circuit Transmission Line having an easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced on the attached checklist. The work will include the performance of road maintenance and tower pad maintenance along the Hanford-Ostrander transmission line. Maintenance will be performed from Tower 10/1, close to Army Loop road near the northeast corner of 200 West Area of the Hanford Nuclear Reservation to the western edge of the Arid Lands Ecological Reserve (ALE) at Tower 17/2 + 700. Total distance of the work is approximately 7.5 miles. The planned work includes spraying with herbicides to minimize vegetation regrowth along the access roads and removing shrubs from within 50 feet of each transmission tower.
- Research Organization:
- Bonneville Power Administration (BPA), Portland, OR (United States)
- Sponsoring Organization:
- USDOE Office of NEPA Policy and Assistance (EH-42)
- OSTI ID:
- 824766
- Report Number(s):
- DOE/EIS-0285/SA-120
- Country of Publication:
- United States
- Language:
- English
Similar Records
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-133 Hanford-Ostrander [Mile 126/1-146/4])
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) - Ostrander-Pearl Transmission Line