Title: GT-MHR COMMERCIALIZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003

Technical Report ·
DOI:https://doi.org/10.2172/815746· OSTI ID:815746

OAK A271 GT-MHR COMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003. In the process of fabricating the MHR-1 irradiation test capsule, Petten has advised that three thermocouples (out of 24) and the Self Powered Neutron detector were damaged during high temperature brazing with the upper capsule lid. Procurement of new TCs and SPN is in process but there will be a delay in the irradiation test of about nine weeks. Startup of the irradiation is now projected to be July or August 2004. In preparation for performing the nuclear design analysis activities required by the advanced fuel studies task, a complete 3-D nuclear design analysis is first being performed of the GT-MHR reference design. This will serve as the baseline for studies of the advanced fuel nuclear design performance.

Research Organization:
General Atomics, San Diego, CA (United States)
Sponsoring Organization:
(US)
DOE Contract Number:
AC03-01SF22343
OSTI ID:
815746
Resource Relation:
Other Information: PBD: 1 Aug 2003
Country of Publication:
United States
Language:
English