skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Geotechnical Analysis Report for July 2001 - June 2002

Technical Report ·
DOI:https://doi.org/10.2172/814859· OSTI ID:814859

This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports on a quarterly basis to document the geomechanical performance during and immediately after excavation of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2001, to June 30, 2002. It is divided into ten chapters. The remainder of Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation located in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5, 6, and 7 present the results of geomechanical monitoring in the three main portions of the WIPP underground facility (the access drifts, the Northern Experimental Area, and the Waste Disposal Area). Chapter 8 discusses the results of the Geoscience Program, which include fracture and stratigraphic mapping, borehole and core logging, and borehole observations. Chapter 9 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 10 lists the References and Bibliography.

Research Organization:
Waste Isolation Pilot Plant, Carlsbad, NM (United States); Washington TRU Solutions LLC (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC04-01AL66444
OSTI ID:
814859
Report Number(s):
DOE/WIPP-03-3177; TRN: US0304871
Resource Relation:
Other Information: PBD: 20 Sep 2002
Country of Publication:
United States
Language:
English