FFTF Final Safety Analysis Report Amendment 81 [SEC 1 & 2]
Since the last reactor operation of FFTF in March of 1992, the FFTF has either been in a programmatic status of Standby or Shutdown. The facility hazards have decreased markedly. Rather than making extensive Final Safety Analysis Report (FSAR) changes, Appendix G was prepared to reflect the design and operation during Standby or Shutdown. Appendix G describes the application of the entire FSAR for the current configuration, accounting for the natural reduction in hazards and new system configurations associated with Standby/Shutdown. The technical system chapters and the safety analysis chapter of the FSAR describe how the design and operation fulfilled the requirements necessary to support reactor operation; this information is retained for design basis and historical information. This Final Safety Analysis Report (FSAR) is submitted per the requirements of Paragraph 014, Energy Research and Development Administration (ERDA) Manual Chapter 0540, ''Safety of ERDA-Owned Reactors.'' This FSAR and its supporting documentation provide a complete description and safety evaluation of the site, plant design, normal and emergency operations, potential accidents and predicted consequences of such accidents, and the means that will prevent such accidents and/or reduce their consequences to an acceptable level.
- Research Organization:
- Fluor Hanford, Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Management (EM) (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 808558
- Report Number(s):
- WHC-TI-75002, Rev.81; TRN: US0302198
- Resource Relation:
- Other Information: PBD: 10 Jan 2002
- Country of Publication:
- United States
- Language:
- English
Similar Records
REVIEW OF FAST FLUX TEST FACILITY (FFTF) FUEL EXPERIMENTS FOR STORAGE IN INTERIM STORAGE CASKS (ISC)
Fast Flux Test Facility final safety analysis report. Amendment 72