Baseline Design Compliance Matrix for the Type 4 In Situ Vapor Samplers and Supernate and Sludge and Soft Saltcake Grab Sampling
The DOE has identified a need to sample vapor space, exhaust ducts, supernate, sludge, and soft saltcake in waste tanks that store radioactive waste. This document provides the Design Compliance Matrix (DCM) for the Type 4 In-Situ Vapor Sampling (ISVS) system and the Grab Sampling System that are used for completing this type of sampling function. The DCM identifies the design requirements and the source of the requirements for the Type 4 ISVS system and the Grab Sampling system. The DCM is a single-source compilation design requirements for sampling and sampling support equipment and supports the configuration management of these systems.
- Research Organization:
- NHC (US)
- Sponsoring Organization:
- USDOE Office of Environmental Management (EM) (US)
- DOE Contract Number:
- AC27-99RL14047
- OSTI ID:
- 804758
- Report Number(s):
- RPP-5275, Rev.1; ECN-657980; TRN: US0301167
- Resource Relation:
- Other Information: PBD: 28 Sep 2000
- Country of Publication:
- United States
- Language:
- English
Similar Records
Baseline Design Compliance Matrix for the Type 4 In Situ Vapor Samplers (ISVS)
Tanks 3F and 2F Saltcake Core and Supernate Sample Analysis
Partial Acceptance for Beneficial Use (ABU) for the Type 4 In Situ Vapor Sampler (ISVS) Carts
Technical Report
·
Tue Jan 25 00:00:00 EST 2000
·
OSTI ID:804758
Tanks 3F and 2F Saltcake Core and Supernate Sample Analysis
Technical Report
·
Wed Jul 07 00:00:00 EDT 2004
·
OSTI ID:804758
Partial Acceptance for Beneficial Use (ABU) for the Type 4 In Situ Vapor Sampler (ISVS) Carts
Technical Report
·
Tue Mar 21 00:00:00 EST 2000
·
OSTI ID:804758