Title: Engineering Task Plan for Hepa Filter Differential Pressure (DP) Fan Interlock Upgrades

Technical Report ·
DOI:https://doi.org/10.2172/803664· OSTI ID:803664

This document provides a plan for installation of Differential Pressure (DP) fan interlocks on the primary ventilation systems in selected Tank Farm facilities. This plan contains the engineering tasks required for installation and is summarized by the Acceptance for Beneficial Use list. Individuals responsible for each task are identified and scheduled accordingly.