Title: Plan for the Startup of HA-21I Furnace Operations at the Plutonium Finishing Plant (PFP)

Technical Report ·
DOI:https://doi.org/10.2172/801323· OSTI ID:801323

Achievement of Thermal Stabilization mission elements require the installation and startup of three additional muffle furnaces for the thermal stabilization of plutonium and plutonium bearing materials at the Plutonium Finishing Plant (PFP). The release to operate these additional furnaces will require an Activity Based Startup Review. The conduct of the Activity Based Startup Review (ABSR) was approved by Fluor Daniel Hanford on October 15, 1999. This plan has been developed with the objective of identifying those activities needed to guide the controlled startup of five furnaces from authorization to unrestricted operations by adding the HA-211 furnaces in an orderly and safe manner after the approval to Startup has been given. The Startup Plan provides a phased approach that bridges the activities between the completion of the Activity Based Startup Review authorizing the use of the three additional furnaces and the unrestricted operation of the five thermal stabilization muffle furnaces. The four phases are: (1) the initiation of five furnace operations using three empty (simulated full) boat charges from HA-211 and two full charges from HC-21C; (2) three furnace operations (one full charge from HA-211 and two full charges from HC-21C); (3) four furnace operations (two full charges from HA-211 and two full charges from HC-21C); and (4) integrated five furnace operations and unrestricted operations. Phase 1 of the Plan will be considered as the cold runs. This Plan also provides management oversight and administrative controls that are to be implemented until unrestricted operations are authorized. It also provides a formal review process for ensuring that all preparations needed for full five furnace operations are completed and formally reviewed prior to proceeding to the increased activity levels associated with five furnace operations. Specific objectives include: (1) To ensure that activities are conducted in a safe manner. (2) To provide supplemental technical and managerial support to Thermal Stabilization activities during the initial use of the HA-211 Furnaces until the commencement of full five furnace, unrestricted operations. (3) Ensure that operations can be conducted in a manner that meets PFP and DOE expectations associated with the principles of integrated safety management. (4) To ensure that all interfacing activities needed to meet Thermal Stabilization mission objectives are completed.

Research Organization:
Fluor Hanford, Richland, WA (United States)
Sponsoring Organization:
ENVIRONMENTAL MANAGEMENT (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
801323
Report Number(s):
HNF-5638, Rev.1; ECN-652164; TRN: US0300359
Resource Relation:
Other Information: PBD: 17 Feb 2000
Country of Publication:
United States
Language:
English

Similar Records

Plan for the Initiation of HA-211 Furnace Operations at the Plutonium Finishing Plan (PFP)
Technical Report · Thu Jan 20 00:00:00 EST 2000 · OSTI ID:801323

System Design Description PFP Thermal Stabilization
Technical Report · Thu Jan 27 00:00:00 EST 2000 · OSTI ID:801323

Engineering study on conveyor system for HC-21C project
Technical Report · Thu Feb 02 00:00:00 EST 1995 · OSTI ID:801323