skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Status Report on PEP-II Performance

Technical Report ·
DOI:https://doi.org/10.2172/799909· OSTI ID:799909

PEP-II [1-9] is an e{sup +}e{sup -} collider with asymmetric energies (3.1 and 9 GeV, respectively) in a 2200 m tunnel at the Stanford Linear Accelerator Center. The collider produces B mesons to study a particle physics effect called CP violation as well as other physics topics. PEP-II was completed in 1998 with the first luminosity generated in July of that year. The installation of the BaBar Detector was finished in May 1999. The overall layout of PEP-II is shown in Figure 1 and the interaction region of PEP-II in Figure 2. The accelerator parameters and achievements of the High Energy Ring (HER) are listed in Table 1 and those for the Low Energy Ring (LER) in Table 2. The two beams collide at a single point in the IR2 hall where the BaBar detector is located. Beam parameters at the best luminosity are shown in Table 3 and PEP-II milestones in Table 4. In August 1999 PEP-II passed the world's record for luminosity which was 8.1 x 10{sup 32}/cm{sup 2}/s. The present luminosity in PEP-II is 2.15 x 10{sup 33}/cm{sup 2}/s which is 72% of the design. In June 2000 PEP-II delivered an integrated luminosity of 150 pb{sup -1} in one day, which is above the design integrated luminosity per day of 135 pb{sup -1}. Over the past year PEP-II has delivered over 12 fb{sup -1} to BaBar. BaBar has logged over 11 pb{sup -1}. The present plan is collide until the end of October 2000 followed by a three month installation period.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
799909
Report Number(s):
SLAC-PUB-8629; TRN: US0206153
Resource Relation:
Other Information: PBD: 20 Aug 2002
Country of Publication:
United States
Language:
English

Similar Records

PEP-II Operations Report
Conference · Wed Nov 01 00:00:00 EST 2000 · OSTI ID:799909

Status Report and Future Plans for the PEP-II B Factory
Technical Report · Thu Apr 12 00:00:00 EDT 2001 · OSTI ID:799909

Progress of the PEP-II-B-factory
Conference · Sun Jun 01 00:00:00 EDT 2003 · OSTI ID:799909