Technical Basis for Implementation of the PCM-1B for Personnel Release at Tank Farms
The purpose of this document is to define the technical basis and implementing guidelines for using automated personnel contamination monitors, such as the PCM-1B, at the River Protection Project (RPP) in lieu of performing a hand-held instrument followed by a PCM-1B survey for personnel release from contamination areas requiring a beta-gamma whole body survey. This document provides the basis for full implementation of the PCM-1B release survey, without the supplemental hand and foot survey, as currently implemented at RPP. This document applies only to RPP facilities. This document does not provide the technical basis for determining the equivalency of an automated system to hand-held instruments, or to the effective counting capability of automated systems as such technical determinations are contained in TBTN: GDGH-9604-RLS-0015.
- Research Organization:
- LMHC (US)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC27-99RL14047
- OSTI ID:
- 798833
- Report Number(s):
- RPP-4873, Rev.0; TRN: US0205442
- Resource Relation:
- Other Information: PBD: 3 Dec 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Technical Basis for Implementation of the PCM-1B for Personnel Release at Tank Farms
Technical basis for implementation of remote reading capabilities for radiological control instruments at tank farms