Project W-314 updated acceptance test report HNF-4649 for HNF-4648 241-AN-A pit leak detection ANA-WT-LDSTA-331 for project W-314
The purpose of the test was to verify that the AN Tank Farm AN-A Pit Leak Detector components are functionally integrated and operate in accordance with engineering design specifications. The Acceptance Test Procedure HNF-4648,24l-AN-A-Pit Leak Detection ANA-WT-LDSTA-331 was conducted between 23 June and 01 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure were found to be labeled and identified as written in the procedure.
- Research Organization:
- TRS (US)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 798032
- Report Number(s):
- HNF-4649, Rev.0; TRN: US0204331
- Resource Relation:
- Other Information: PBD: 30 Sep 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-314 acceptance test report HNF-4647 for HNF-4646 241-B pit leak detection ANB-WT-LDSTA-231 for project W-314
Project W-314 acceptance test report HNF-4651 for HNF-4650 SN-268 encasement leak detection ANA-WT-LDSTA-335 for project W-314
Project W-314 acceptance test report HNF-4643 for HNF-4642 241-AN-A valve pit manifold valves and position indication for project W-314
Technical Report
·
Thu Sep 30 00:00:00 EDT 1999
·
OSTI ID:798032
Project W-314 acceptance test report HNF-4651 for HNF-4650 SN-268 encasement leak detection ANA-WT-LDSTA-335 for project W-314
Technical Report
·
Thu Sep 30 00:00:00 EDT 1999
·
OSTI ID:798032
Project W-314 acceptance test report HNF-4643 for HNF-4642 241-AN-A valve pit manifold valves and position indication for project W-314
Technical Report
·
Wed Sep 22 00:00:00 EDT 1999
·
OSTI ID:798032