INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
This is the 6th Quarterly Report under this contract. During this period, the Advanced ElectroCore module precharger and its support frame were installed at Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. This represents the vast portion of the installation work. Ductwork and instrumentation needs to installed before the Advanced ElectroCore module can be tested and demonstrated. Also, the Advanced ElectroCore test plan draft has been prepared, and a design arrangement of a new multipollutant control system with the ElectroCore has been developed.
- Research Organization:
- National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- FC26-00NT40757
- OSTI ID:
- 794131
- Report Number(s):
- FC26-00NT40757-06; TRN: US200209%%30
- Resource Relation:
- Other Information: PBD: 1 Mar 2002
- Country of Publication:
- United States
- Language:
- English
Similar Records
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
Technical Report
·
Fri Jun 01 00:00:00 EDT 2001
·
OSTI ID:794131
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
Technical Report
·
Sun Jun 30 00:00:00 EDT 2002
·
OSTI ID:794131
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
Technical Report
·
Mon Jan 01 00:00:00 EST 2001
·
OSTI ID:794131