Title: BLAST FURNACE GRANULAR COAL INJECTION SYSTEM. Final Report Volume 2: Project Performance and Economics

Abstract

Bethlehem Steel Corporation (BSC) requested financial assistance from the Department of Energy (DOE), for the design, construction and operation of a 2,800-ton-per-day blast furnace granulated coal injection (BFGCI) system for two existing iron-making blast furnaces. The blast furnaces are located at BSC's facilities in Burns Harbor, Indiana. The demonstration project proposal was selected by the DOE and awarded to Bethlehem in November 1990. The design of the project was completed in December 1993 and construction was completed in January 1995. The equipment startup period continued to November 1995 at which time the operating and testing program began. The blast furnace test program with different injected coals was completed in December 1998.

Authors:
Publication Date:
Research Org.:
National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
794051
Report Number(s):
FC21-91MC27362-41
TRN: US200208%%224
DOE Contract Number:  
FC21-91MC27362
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 1 Oct 1999
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; 36 MATERIALS SCIENCE; BLAST FURNACES; COAL; CONSTRUCTION; DESIGN; FINANCING; INDIANA; STEELS; TESTING

Citation Formats

Unknown,. BLAST FURNACE GRANULAR COAL INJECTION SYSTEM. Final Report Volume 2: Project Performance and Economics. United States: N. p., 1999. Web. doi:10.2172/794051.
Unknown,. BLAST FURNACE GRANULAR COAL INJECTION SYSTEM. Final Report Volume 2: Project Performance and Economics. United States. https://doi.org/10.2172/794051
Unknown,. 1999. "BLAST FURNACE GRANULAR COAL INJECTION SYSTEM. Final Report Volume 2: Project Performance and Economics". United States. https://doi.org/10.2172/794051. https://www.osti.gov/servlets/purl/794051.
@article{osti_794051,
title = {BLAST FURNACE GRANULAR COAL INJECTION SYSTEM. Final Report Volume 2: Project Performance and Economics},
author = {Unknown,},
abstractNote = {Bethlehem Steel Corporation (BSC) requested financial assistance from the Department of Energy (DOE), for the design, construction and operation of a 2,800-ton-per-day blast furnace granulated coal injection (BFGCI) system for two existing iron-making blast furnaces. The blast furnaces are located at BSC's facilities in Burns Harbor, Indiana. The demonstration project proposal was selected by the DOE and awarded to Bethlehem in November 1990. The design of the project was completed in December 1993 and construction was completed in January 1995. The equipment startup period continued to November 1995 at which time the operating and testing program began. The blast furnace test program with different injected coals was completed in December 1998.},
doi = {10.2172/794051},
url = {https://www.osti.gov/biblio/794051}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Oct 01 00:00:00 EDT 1999},
month = {Fri Oct 01 00:00:00 EDT 1999}
}