2ND FEASIBILITY STUDY OF A MUON STORAGE RING NEUTRINO FACTORY.
Conference
·
OSTI ID:787632
The design and simulated performance of a second feasibility study are presented. The efficiency of producing muons is {approx} 0.17 {micro}/p with 24 GeV protons. This study was sponsored by the BNL Director, with BNL site specific driver and layout. It was a follow on to the First Study[2] sponsored by the Fermilab Director, with Fermilab site specific driver and layout, and was the main US collaboration conceptual effort during the past year. Other studies, and technical work by the collaboration is reported in other papers.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC02-98CH10886
- OSTI ID:
- 787632
- Report Number(s):
- BNL-68638; KA04; R&D Project: PO23; KA04; TRN: US0109342
- Resource Relation:
- Conference: PARTICLE ACCELERATOR CONFERENCE 2001, CHICAGO, IL (US), 06/18/2001--06/22/2001; Other Information: PBD: 18 Jun 2001
- Country of Publication:
- United States
- Language:
- English
Similar Records
MUON STORAGE RINGS - NEUTRINO FACTORIES
NEUTRINO FACTORY BASED ON MUON-STORAGE-RINGS TO MUON COLLIDERS: PHYSICS AND FACILITIES.
FY2009 R&D Plan: Neutrino Factory and Muon Collider Collaboration
Conference
·
Tue May 30 00:00:00 EDT 2000
·
OSTI ID:787632
NEUTRINO FACTORY BASED ON MUON-STORAGE-RINGS TO MUON COLLIDERS: PHYSICS AND FACILITIES.
Conference
·
Mon Jun 18 00:00:00 EDT 2001
·
OSTI ID:787632
FY2009 R&D Plan: Neutrino Factory and Muon Collider Collaboration
Technical Report
·
Thu Mar 05 00:00:00 EST 2009
·
OSTI ID:787632