skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: 2ND FEASIBILITY STUDY OF A MUON STORAGE RING NEUTRINO FACTORY.

Conference ·
OSTI ID:787632

The design and simulated performance of a second feasibility study are presented. The efficiency of producing muons is {approx} 0.17 {micro}/p with 24 GeV protons. This study was sponsored by the BNL Director, with BNL site specific driver and layout. It was a follow on to the First Study[2] sponsored by the Fermilab Director, with Fermilab site specific driver and layout, and was the main US collaboration conceptual effort during the past year. Other studies, and technical work by the collaboration is reported in other papers.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC02-98CH10886
OSTI ID:
787632
Report Number(s):
BNL-68638; KA04; R&D Project: PO23; KA04; TRN: US0109342
Resource Relation:
Conference: PARTICLE ACCELERATOR CONFERENCE 2001, CHICAGO, IL (US), 06/18/2001--06/22/2001; Other Information: PBD: 18 Jun 2001
Country of Publication:
United States
Language:
English