Title: INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS

Technical Report ·
DOI:https://doi.org/10.2172/785168· OSTI ID:785168

This is the 5th Quarterly Report under this contract. During this period the fabrication of the Advanced ElectroCore field prototype was completed and the unit was prepared to be transported to Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. A last minute check of the installation drawings indicated that the supports would interfere with an existing pipe trench at the plant so a cross-trench support frame was designed and built to span the pipe trench. Figure 1 shows the revised position and the new cross-trench support frame that supports the precharger.

Research Organization:
National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
FC26-00NT40757
OSTI ID:
785168
Report Number(s):
FC26-00NT40757-04; TRN: AH200131%%173
Resource Relation:
Other Information: PBD: 1 Jun 2001