INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
This is the 5th Quarterly Report under this contract. During this period the fabrication of the Advanced ElectroCore field prototype was completed and the unit was prepared to be transported to Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. A last minute check of the installation drawings indicated that the supports would interfere with an existing pipe trench at the plant so a cross-trench support frame was designed and built to span the pipe trench. Figure 1 shows the revised position and the new cross-trench support frame that supports the precharger.
- Research Organization:
- National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- FC26-00NT40757
- OSTI ID:
- 785168
- Report Number(s):
- FC26-00NT40757-04; TRN: AH200131%%173
- Resource Relation:
- Other Information: PBD: 1 Jun 2001
- Country of Publication:
- United States
- Language:
- English
Similar Records
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
Technical Report
·
Fri Mar 01 00:00:00 EST 2002
·
OSTI ID:785168
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
Technical Report
·
Sun Jun 30 00:00:00 EDT 2002
·
OSTI ID:785168
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
Technical Report
·
Sun Oct 01 00:00:00 EDT 2000
·
OSTI ID:785168