skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Characterization engineering status report october 1998 - december 1998

Technical Report ·
DOI:https://doi.org/10.2172/782309· OSTI ID:782309

Characterization Engineering (CE) continues to make progress in support of the project goal of characterizing the Hanford high-level waste tanks. Two core sampling systems were operational during this reporting period-push mode core sampling system No. 1 and rotary mode core sampling system No. 4. The availability average for core sampling systems No. 1 , No. 3 and No. 4, combined, was 45 percent, down from 79percent for the previous quarter and 58 percent for FY 1998. System No. 2 did not have scope during the quarter, and availability was not hacked. System No. 3 was out of service the entire quarter for corrective maintenance. Two tanks were core sampled during the reporting period, and 24 samples were retrieved. Core sample recovery increased slightly during the quarter. System No. 1 average sample recovery increased from 80percent to 81 percent, The rotary mode core sampling average recovery increased to 62 percent from 55 percent for the previous quarter. sampling six tanks, one more than scheduled. Vapor Sampling was utilized in support of the sluicing of tank 241-C-106 and for emissions monitoring of three exhaust stacks. Increased support was provided for Vapor Sampling the Standard Hydrogen Monitoring Systems. The sampling was necessary due to freezing problems with the field-installed systems. Preparations are continuing for the Light-Duty Utility Arm (LDUA) deployment with configuration and minor hardware upgrades. The LDUA Operational Readiness Review continues. The oversight of the Nested, Fixed-Depth Sampler system development has started to increase in order to ensure that a usable system is received when the project is completed. To improve configuration control, 92 drawing sheet revisions were completed along with the generation of nine new drawing sheets. The number of outstanding Engineering Change Notices increased slightly because of the addition of more drawings into the project. continues to develop. Organizational responsibilities are being identified and documented as well as the scope and deliverables. Finishing Plant was completed, and the final reviews to authorize starting work have begun. Significant progress was made in other areas as well. Grab Sampling completed The stewardship of the Long Length Contaminated Equipment Removal equipment The engineering and work planning for opening tank 241-2361 at the Plutonium.

Research Organization:
Hanford Site (HNF), Richland, WA (United States)
Sponsoring Organization:
US DOE Office of Environmental Management (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
782309
Report Number(s):
HNF-3963-REV0; TRN: US200219%%114
Resource Relation:
Other Information: PBD: 13 May 1999
Country of Publication:
United States
Language:
English