skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Utility Advanced Turbine Systems (ATS) technology readiness testing

Abstract

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted horn DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include fill speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown.

Publication Date:
Research Org.:
Federal Energy Technology Center Morgantown (FETC-MGN), Morgantown, WV (United States); Federal Energy Technology Center Pittsburgh (FETC-PGH), Pittsburgh, PA (United States)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
750405
Report Number(s):
DE-FC21-95MC31176-20
TRN: AH200028%%190
DOE Contract Number:  
FC21-95MC31176
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 1 May 1999
Country of Publication:
United States
Language:
English
Subject:
20 FOSSIL-FUELED POWER PLANTS; COMBINED-CYCLE POWER PLANTS; COMPRESSORS; DESIGN; GAS TURBINES; HEAT TRANSFER; PERFORMANCE; RELIABILITY; STEAM GENERATORS; PERFORMANCE TESTING; MATERIALS TESTING

Citation Formats

. Utility Advanced Turbine Systems (ATS) technology readiness testing. United States: N. p., 1999. Web. doi:10.2172/750405.
. Utility Advanced Turbine Systems (ATS) technology readiness testing. United States. https://doi.org/10.2172/750405
. 1999. "Utility Advanced Turbine Systems (ATS) technology readiness testing". United States. https://doi.org/10.2172/750405. https://www.osti.gov/servlets/purl/750405.
@article{osti_750405,
title = {Utility Advanced Turbine Systems (ATS) technology readiness testing},
author = {},
abstractNote = {The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted horn DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include fill speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown.},
doi = {10.2172/750405},
url = {https://www.osti.gov/biblio/750405}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat May 01 00:00:00 EDT 1999},
month = {Sat May 01 00:00:00 EDT 1999}
}