10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant heliostat and beam characterization system evaluation, November 1981-December 1986
Test and evaluation results for the heliostats and beam characterization system at the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant are described in this report. Southern California Edison operated and maintained the plant during the five years covered by this evaluation. Therefore, the results represent what can be expected from a large number of heliostats that are operated over a long period of time in a power plant environment. The heliostats and beam characterization system were evaluated for their ability to meet performance and survival requirements. Heliostat evaluation results are reported for mirror soiling rates, mirror corrosion, wind loads, availability, maintenance requirements, tracking accuracy, beam quality, component temperatures, and operating power requirements. The heliostat beam characterization system accuracy is given for the measurement of beam quality, heliostat tracking accuracy, and power in the reflected beam. The heliostat technical specifications and design description are provided, and a detailed design description of the beam characterization system is included. 41 refs.
- Research Organization:
- Sandia National Lab. (SNL-CA), Livermore, CA (United States)
- DOE Contract Number:
- AC04-76DR00789
- OSTI ID:
- 7102805
- Report Number(s):
- SAND87-8003; ON: DE88011359
- Country of Publication:
- United States
- Language:
- English
Similar Records
Heliostat characterization at the Central Receiver Test Facility
10-MWe solar-thermal central-receiver pilot-plant-heliostat experiences, November 1981-February 1983. Monograph series, No. 1
Related Subjects
HELIOSTATS
TESTING
SOLAR RECEIVERS
SOLAR THERMAL POWER PLANTS
BEAMS
EVALUATION
OPERATION
THERMAL ENERGY STORAGE EQUIPMENT
WIND LOADS
DYNAMIC LOADS
EQUIPMENT
POWER PLANTS
SOLAR EQUIPMENT
SOLAR POWER PLANTS
THERMAL POWER PLANTS
CSP
Concentrating Solar Power
141000* - Solar Collectors & Concentrators