skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: TMX-U (Tandem Mirror Experiment Upgrade) ECRH (Electron Cyclotron Resonant Heating) system operations summary

Conference ·
OSTI ID:7056311

The TMX-U ECRH System underwent many extensive changes during the last two years of physics operations. These changes included extensive use of fiber optics and computer control to add flexibility to the system and eliminate noise problems, upgrades to Varian Model VGA-8050M long pulse gyrotron tubes, the addition of gyrotron anode-modulation for better control of individual gyrotrons, and the installation of a fifth gyrotron socket that was used to simultaneously heat both the east and west inner 10 KG locations. This paper discusses the different modifications made to the system and their effects on the overall performance of the entire ECRH system. The paper also discusses the system as it presently exists and possible modifications that would be made if the future modifications were to be performed. 3 refs., 2 figs.

Research Organization:
Lawrence Livermore National Lab., CA (USA)
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
7056311
Report Number(s):
UCRL-96656; CONF-871007-99; ON: DE88011324; TRN: 88-024901
Resource Relation:
Conference: 12. symposium on fusion engineering, Monterey, CA, USA, 12 Oct 1987
Country of Publication:
United States
Language:
English