Title: Breckinridge Project, initial effort

Abstract

Report V, Volume 1 provides descriptions, data, and drawings pertaining to Flare System (Plant 19), Tankage (Plant 20), Interconnecting Piping (Plant 21), River Facilities (Plant 22), Rail, Truck, Pipeline (Plant 23), and Electrical Distribution (Plant 30). Flare System (Plant 19) provides primary and auxiliary flare systems for safe collection and disposal of overpressure relief discharges, and operational and emergency venting of flammable vapors and liquids from the various processing plants and loading facilities. Tankage (Plant 20) provides storage for propane and heavier liquid hydrocarbon products, as well as for by-product ammonia, phenols, and liquid sulfur. Interconnecting Piping (Plant 21) includes the fuel gas blending and distribution system and the interconnecting process and utility piping between process plants and offsites. River Facilities (Plant 22) provides the loading of liquid products and by-products into barges for marine surface transportation, and the unloading of coal from barges. Rail, Truck, Pipeline (Plant 23) provides loading and unloading of products shipped by either rail or truck. Electrical Distribution (Plant 30) receives main utility power from the Big River Electric Corporation and distributes the power to the other plants. The following information is included for each of the six plants: a description of the plant's design,more » including the utility balance, catalysts and chemicals usage, and process flow diagrams, as applicable; an equipment list, including item numbers and descriptions; data sheets and sketches for major plant components; and pertinent engineering drawings. An appendix contains: an overall site plan showing the locations of all plants; and the symbols and legend for piping and instrument diagrams.« less

Publication Date:
Research Org.:
Ashland Synthetic Fuels, Inc., KY (USA); Airco Energy Co., Inc., Ashland, KY (USA)
OSTI Identifier:
6771281
Report Number(s):
DOE/OR/20717-5-Vol.1
ON: DE83000182
DOE Contract Number:  
FC05-80OR20717
Resource Type:
Technical Report
Resource Relation:
Other Information: Portions of document are illegible
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; COAL LIQUEFACTION PLANTS; DESIGN; ENGINEERING; EQUIPMENT; H-COAL PROCESS; DEMONSTRATION PLANTS; AMMONIA; COAL LIQUEFACTION; ELECTRIC POWER; FLARING; FUEL GAS; HYDROCARBONS; LIQUIDS; MIXING; PHENOLS; PROPANE; STORAGE; SULFUR; TERMINAL FACILITIES; VAPORS; ALKANES; AROMATICS; ELEMENTS; FLUIDS; FUELS; GAS FUELS; GASES; HYDRIDES; HYDROGEN COMPOUNDS; HYDROXY COMPOUNDS; INDUSTRIAL PLANTS; LIQUEFACTION; NITROGEN COMPOUNDS; NITROGEN HYDRIDES; NONMETALS; ORGANIC COMPOUNDS; POWER; THERMOCHEMICAL PROCESSES; 010405* - Coal, Lignite, & Peat- Hydrogenation & Liquefaction

Citation Formats

. Breckinridge Project, initial effort. United States: N. p., 1982. Web. doi:10.2172/6771281.
. Breckinridge Project, initial effort. United States. https://doi.org/10.2172/6771281
. 1982. "Breckinridge Project, initial effort". United States. https://doi.org/10.2172/6771281. https://www.osti.gov/servlets/purl/6771281.
@article{osti_6771281,
title = {Breckinridge Project, initial effort},
author = {},
abstractNote = {Report V, Volume 1 provides descriptions, data, and drawings pertaining to Flare System (Plant 19), Tankage (Plant 20), Interconnecting Piping (Plant 21), River Facilities (Plant 22), Rail, Truck, Pipeline (Plant 23), and Electrical Distribution (Plant 30). Flare System (Plant 19) provides primary and auxiliary flare systems for safe collection and disposal of overpressure relief discharges, and operational and emergency venting of flammable vapors and liquids from the various processing plants and loading facilities. Tankage (Plant 20) provides storage for propane and heavier liquid hydrocarbon products, as well as for by-product ammonia, phenols, and liquid sulfur. Interconnecting Piping (Plant 21) includes the fuel gas blending and distribution system and the interconnecting process and utility piping between process plants and offsites. River Facilities (Plant 22) provides the loading of liquid products and by-products into barges for marine surface transportation, and the unloading of coal from barges. Rail, Truck, Pipeline (Plant 23) provides loading and unloading of products shipped by either rail or truck. Electrical Distribution (Plant 30) receives main utility power from the Big River Electric Corporation and distributes the power to the other plants. The following information is included for each of the six plants: a description of the plant's design, including the utility balance, catalysts and chemicals usage, and process flow diagrams, as applicable; an equipment list, including item numbers and descriptions; data sheets and sketches for major plant components; and pertinent engineering drawings. An appendix contains: an overall site plan showing the locations of all plants; and the symbols and legend for piping and instrument diagrams.},
doi = {10.2172/6771281},
url = {https://www.osti.gov/biblio/6771281}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Jan 01 00:00:00 EST 1982},
month = {Fri Jan 01 00:00:00 EST 1982}
}