Quality improvement program for the B83 bomb hand truck
This report describes the problems, issues, and history of the H1347 bomb hand truck for the B83 bomb after the bomb was put into stockpile in the mid-1980s. Major issues that were reported in Unsatisfactory Reports (URs) were cracking problems on stacking fixture welds, cracked welds on the caster bracket receptacles on the cradle, cracked caster mounting brackets, casters unlocking from the swivel lock position, and caster tires rubbing and binding on the stacking frame. Resolution of these and other problems is described. The introduction of the H695B storage-only bomb hand truck to alleviate a shortage of bomb hand trucks in the mid-1990s is described. The development and qualification of the H1347A bomb hand truck as a replacement for the H695 B is covered. The results from load test evaluations on the stacking fixture, cradle, and casters for the H1347 are described along with towing results on one and two-high stack configurations of B83 bombs in bomb hand trucks. New towing and truck/trailer transport procedures are described. Development, evaluation, and production recommendations for a stronger caster mounting bracket are described.
- Research Organization:
- Sandia National Lab. (SNL-CA), Livermore, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 656824
- Report Number(s):
- SAND-97-8012; ON: DE98053031; TRN: AHC29817%%383
- Resource Relation:
- Other Information: PBD: Apr 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Alaskan frozen soil impact tests of the B83-C/S and Strategic Earth Penetrator
Electrochemical machining of the outer profile of the B83 Lug