Title: Hawaii geothermal project. Phase III. Well testing and analysis. Quarterly progress report, January 1-March 31, 1977

Abstract

Management and geosciences program activities are reviewed briefly. The primary emphasis in geosciences is on continued data analysis and synthesis. The engineering program continued with numerical modelling activities. The HGP-A wellhead assembly has been modified to reduce the noise level, and a new wellhead platform has been built which meets OSHA standards. HGP-A has been flash discharged from January 26 to February 11, 1977 and data obtained for throttled flow conditions by inserting orifices of varied sizes in the discharge line. A second pressure buildup test was run after the well was shut-in. Pressure and temperature profiles have been obtained during discharge and quiescent periods. Reservoir analyses have been made using pressure buildup and drawdown data.

Authors:
; ;
Publication Date:
Research Org.:
Hawaii Univ., Honolulu (USA)
OSTI Identifier:
6485355
Report Number(s):
DOE/ET/28302-T11
DOE Contract Number:  
AC03-76ET28302
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
15 GEOTHERMAL ENERGY; GEOTHERMAL WELLS; TESTING; HAWAII; BUDGETS; DATA ANALYSIS; NOISE POLLUTION; WELL PRESSURE; WELL TEMPERATURE; NORTH AMERICA; POLLUTION; RESERVOIR PRESSURE; RESERVOIR TEMPERATURE; USA; WELLS; WESTERN REGION; Geothermal Legacy

Citation Formats

Shupe, J W, Helsley, C E, and Yuen, P C. Hawaii geothermal project. Phase III. Well testing and analysis. Quarterly progress report, January 1-March 31, 1977. United States: N. p., 1977. Web. doi:10.2172/6485355.
Shupe, J W, Helsley, C E, & Yuen, P C. Hawaii geothermal project. Phase III. Well testing and analysis. Quarterly progress report, January 1-March 31, 1977. United States. https://doi.org/10.2172/6485355
Shupe, J W, Helsley, C E, and Yuen, P C. 1977. "Hawaii geothermal project. Phase III. Well testing and analysis. Quarterly progress report, January 1-March 31, 1977". United States. https://doi.org/10.2172/6485355. https://www.osti.gov/servlets/purl/6485355.
@article{osti_6485355,
title = {Hawaii geothermal project. Phase III. Well testing and analysis. Quarterly progress report, January 1-March 31, 1977},
author = {Shupe, J W and Helsley, C E and Yuen, P C},
abstractNote = {Management and geosciences program activities are reviewed briefly. The primary emphasis in geosciences is on continued data analysis and synthesis. The engineering program continued with numerical modelling activities. The HGP-A wellhead assembly has been modified to reduce the noise level, and a new wellhead platform has been built which meets OSHA standards. HGP-A has been flash discharged from January 26 to February 11, 1977 and data obtained for throttled flow conditions by inserting orifices of varied sizes in the discharge line. A second pressure buildup test was run after the well was shut-in. Pressure and temperature profiles have been obtained during discharge and quiescent periods. Reservoir analyses have been made using pressure buildup and drawdown data.},
doi = {10.2172/6485355},
url = {https://www.osti.gov/biblio/6485355}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Apr 01 00:00:00 EST 1977},
month = {Fri Apr 01 00:00:00 EST 1977}
}