The A0 abort system for the Tevatron upgrade
The installation of electrostatic separator modules at B48 and C17 in the Tevatron necessitates changes to the Tevatron abort system. There will no longer be room for either the proton or antiproton kicker magnets used in the present system. The kickers at C17 will be permanently removed. The kickers at B48 will be temporarily removed for collider operation and will be replaced for fixed target operation. The existing proton abort system will remain unchanged during fixed target operation. This note describes a proposed abort system for operation in the collider mode for 22 on 22 bunches and provides details of specifications for the required components. In certain cases, for example in the case of the pulsers for the magnets and the absorber assembly, system components are designed with the option of upgrading to 44 on 44 bunch operation in mind. 8 refs., 14 figs.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 6473182
- Report Number(s):
- FNAL-TM-1564; ON: DE89009705
- Resource Relation:
- Other Information: Portions of this document are illegible in microfiche products
- Country of Publication:
- United States
- Language:
- English
Similar Records
Abort kicker power supply systems at Fermilab
Abort kicker power supply systems at Fermilab