Spent Fuel Test-Climax: An evaluation of the technical feasibility of geologic storage of spent nuclear fuel in granite: Final report
- comp.
In the Climax stock granite on the Nevada Test Site, eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized. When test data indicated that the test objectives were met during the 3-year storage phase, the spent-fuel canisters were retrieved and the thermal sources were de-energized. The project demonstrated the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner. In addition to emplacement and retrieval operations, three exchanges of spent-fuel assemblies between the SFT-C and a surface storage facility, conducted during the storage phase, furthered this demonstration. The test led to development of a technical measurements program. To meet these objectives, nearly 1000 instruments and a computer-based data acquisition system were deployed. Geotechnical, seismological, and test status data were recorded on a continuing basis for the three-year storage phase and six-month monitored cool-down of the test. This report summarizes the engineering and scientific endeavors which led to successful design and execution of the test. The design, fabrication, and construction of all facilities and handling systems are discussed, in the context of test objectives and a safety assessment. The discussion progresses from site characterization and experiment design through data acquisition and analysis of test data in the context of design calculations. 117 refs., 52 figs., 81 tabs.
- Research Organization:
- Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
- DOE Contract Number:
- W-7405-ENG-48
- OSTI ID:
- 60112
- Report Number(s):
- UCRL-53702; ON: DE87014322
- Resource Relation:
- Other Information: PBD: 30 Mar 1986
- Country of Publication:
- United States
- Language:
- English
Similar Records
Spent Fuel Test - Climax: technical measurements. Interim report, fiscal year 1982
Spent fuel test - Climax: technical measurements. Interim report, fiscal year 1981