Transuranium processing plant
The Transuranium Processing Plant (TRU) is a remotely operated, hot-cell, chemical processing facility of advanced design. The heart of TRU is a battery of nine heavily shielded process cells housed in a two-story building. Each cell, with its 54-inch-thick walls of a special high-density concrete, has enough shielding to stop the neutrons and gamma radiation from 1 gram of 252/sub Cf/ and associated fission products. Four cells contain chemical processing equipment, three contain equipment for the preparation and inspection of HFIR targets, and two cells are used for analytical chemistry operations. In addition, there are eight laboratories used for process development, for part of the process-control analyses, and for product finishing operations. Although the Transuranium Processing Plant was built for the purpose of recovering transuranium elements from targets irradiated in the High Flux Isotope Reactor (HFIR), it is also a highly versatile facility which has extensive provisions for changing and modifying equipment. Thus, it was a relatively simple matter to install a Solvent Extraction Test Facility (SETF) in one of the TRU chemical processing cells for use in the evaluation and demonstration of solvent extraction flowsheets for the recovery of fissile and fertile materials from irradiated reactor fuels. The equipment in the SETF has been designed for process development and demonstrations and the particular type of mixer-settler contactors was chosen because it is easy to observe and sample.
- Research Organization:
- Oak Ridge National Lab., TN (USA)
- DOE Contract Number:
- W-7405-ENG-26
- OSTI ID:
- 5997483
- Report Number(s):
- CONF-830225-4; ON: DE83009791
- Resource Relation:
- Conference: Nuclear fuel cycle information workshop, Oak Ridge, TN, USA, 15 Feb 1983; Other Information: Portions are illegible in microfiche products
- Country of Publication:
- United States
- Language:
- English
Similar Records
Californium production at the transuranium processing plant. [Transuranium processing plant design, equipment, and facilities]
Transuranium Processing Plant semiannual report of production, status, and plans for period ending December 31, 1975
Related Subjects
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS
HOT LABS
ORNL
PROCESSING
SOLVENT EXTRACTION
TEST FACILITIES
TRANSURANIUM ELEMENTS
ELEMENTS
EXTRACTION
LABORATORIES
NATIONAL ORGANIZATIONS
SEPARATION PROCESSES
US AEC
US DOE
US ERDA
US ORGANIZATIONS
420203* - Engineering- Handling Equipment & Procedures
050800 - Nuclear Fuels- Spent Fuels Reprocessing