Title: Fate and transport of constituents leaked from Tank 241-A-105

Technical Report ·
DOI:https://doi.org/10.2172/5977909· OSTI ID:5977909

Following a January 28, 1965 sudden steam release in Tank 241-A-105, the carbon steel liner of the tank was noted to have bulged to a maximum height of about 8.5 feet (2.6 meters). Most of this bulging likely resulted from the January 28, 1965 incident. But available data indicate that some bulging during an earlier leak in 1963 when waste was being added to the tank may have contributed. By March 8, 1965, increases in radiation in the 14-05-03 leak detection lateral indicted that fluids had escaped the tank and that the liner was ruptured. Waste was subsequently transferred from Tank 241-A-105 to other tanks, and liquid levels in Tank 241-A-105 were maintained at about 18 inches to control temperature to prevent deterioration of the concrete. Spray cooling water was added weekly to the tank from February 1971 to December 1978 to maintain liquid levels and temperatures, and some of this fluid is assumed to have leaked from the tank. This study examined available data to determine, to the extent possible, the distribution of the leaked constituents in surrounding soils and whether they migrated to groundwater. In this assessment, available data from gross gamma logging of dry wells and leak detection laterals as well as data from analyses of groundwater samples were examined throughout the period of interest. Logs of wells and photographs taken during construction of the 241-A-105 Tank Farm were also examined.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
5977909
Report Number(s):
WHC-EP-0412; ON: DE92002914
Country of Publication:
United States
Language:
English