skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The proposed injection system for an asymmetric B Factory in the PEP tunnel

Conference ·
OSTI ID:5805544
; ; ; ; ;  [1];  [2]
  1. Stanford Linear Accelerator Center, Menlo Park, CA (USA)
  2. Lawrence Livermore National Lab., CA (USA)

The proposed asymmetric energy B Factory to be built in the PEP tunnel at SLAC will require a highly effective and profuse source of low emittance electron and positron bunches. The B factory will consist of two rings of equal size, a 9 GeV electron ring and a 3.1 GeV positron ring, each with 1658 bunches with total circulating currents of 1.5 and 2.1 amperes respectively. As the luminosity lifetime of the collider is expected to be about two hours, the injector should be capable of filling the rings in a small fraction of an hour. It turns out that with some simple modifications, the SLC linac with its damping rings and positron source is ideally suited to fulfill this function effectively. The overall injection system is described in this paper. 4 figs., 2 tabs.

Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (USA); Lawrence Livermore National Lab., CA (USA)
Sponsoring Organization:
USDOE; USDOE, Washington, DC (USA)
DOE Contract Number:
AC03-76SF00515; W-7405-ENG-48
OSTI ID:
5805544
Report Number(s):
SLAC-PUB-5526; CONF-910505-117; ON: DE91013274
Resource Relation:
Conference: 1991 Institute of Electrical and Electronics Engineers (IEEE) particle accelerator conference (PAC), San Francisco, CA (USA), 6-9 May 1991
Country of Publication:
United States
Language:
English