Upgrading the Fermilab linac local control system
- Fermilab
A new control system for the Fermilab Linac is being designed, built and implemented. First, the nine-year-old linac control system is being replaced. Second, a control system for the new 805 MHz part of the linac is being built. The two systems are essentially identical, so that when the installations are complete, we will still have a single Linac Control System. 8 refs., 5 figs.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 5769838
- Report Number(s):
- FERMILAB-LU-173; FERMILAB-CONF-91-045; oai:inspirehep.net:315770
- Resource Relation:
- Conference: 1990 Linear accelerator conference, Albuquerque, NM (USA), 9-14 Sep 1990
- Country of Publication:
- United States
- Language:
- English
Similar Records
The Fermilab linac upgrade
Temperature control feedback loops for the linac upgrade side coupled cavities at Fermilab
The Fermilab 400-MeV Linac Upgrade
Technical Report
·
Fri Feb 01 00:00:00 EST 1991
·
OSTI ID:5769838
Temperature control feedback loops for the linac upgrade side coupled cavities at Fermilab
Technical Report
·
Thu Oct 25 00:00:00 EDT 1990
·
OSTI ID:5769838
The Fermilab 400-MeV Linac Upgrade
Conference
·
Sat May 01 00:00:00 EDT 1993
·
OSTI ID:5769838