Blanket Module Boil-Off Times during a Loss-of-Coolant Accident - Case 0: with Beam Shutdown only
This report is one of a series of reports that document LBLOCA analyses for the Accelerator Production of Tritium primary blanket Heat Removal system. This report documents the analysis results of a LBLOCA where the accelerator beam is shut off without primary pump trips and neither the RHR nor the cavity flood systems operation.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC09-96SR18500
- OSTI ID:
- 4919
- Report Number(s):
- WSRC-TR-98-00213; TRN: US0101580
- Resource Relation:
- Other Information: PBD: 7 Oct 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
APT Blanket System Loss-of-Coolant Accident (LOCA) Based on Initial Conceptual Design - Case 2: with Beam Shutdown Only
APT Blanket System Loss-of-Flow Accident (LOFA) Analysis Based on Initial Conceptual Design - Case 1: with Beam Shutdown and Active RHR
APT Blanket System Loss-of-Coolant Accident Based on Initial Conceptual Design - Case 5: External RHR Break Near Inlet Header
Technical Report
·
Wed Oct 07 00:00:00 EDT 1998
·
OSTI ID:4919
APT Blanket System Loss-of-Flow Accident (LOFA) Analysis Based on Initial Conceptual Design - Case 1: with Beam Shutdown and Active RHR
Technical Report
·
Wed Oct 07 00:00:00 EDT 1998
·
OSTI ID:4919
APT Blanket System Loss-of-Coolant Accident Based on Initial Conceptual Design - Case 5: External RHR Break Near Inlet Header
Technical Report
·
Wed Oct 07 00:00:00 EDT 1998
·
OSTI ID:4919