Sampling and analysis plan for groundwater and surface water monitoring at the Y-12 Plant during calendar year 1995
Abstract
This plan provides a description of the groundwater and surface-water quality monitoring activities planned for calendar year (CY) 1995 at the Department of Energy Y-12 Plant. Included in this plan are the monitoring activities managed by the Y-12 Plant Health, Safety, Environment, and Accountability (HSEA) Organization through the Y-12 Plant Groundwater Protection Program (GWPP). Other groundwater and surface water monitoring activities (e.g. selected Environmental Restoration Program activities, National Pollution Discharge Elimination System (NPDES) monitoring) not managed through the Y-12 Plant GWPP are not addressed in this report. Several monitoring programs will be implemented in three hydrogeologic regimes: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located within Bear Creek Valley, and the Chestnut Ridge Regime is located south of the Y-12 Plant. For various reasons, modifications to the 1995 monitoring programs may be necessary during implementation. For example, changes in regulatory requirements may alter the parameters specified for selected wells, or wells could be added to or deleted from the monitoring network. All modifications to the monitoring programs will be approved bymore »
- Publication Date:
- Research Org.:
- Oak Ridge Y-12 Plant (Y-12), Oak Ridge, TN (United States); HSW Environmental Consultants, Inc., Oak Ridge, TN (United States)
- Sponsoring Org.:
- USDOE, Washington, DC (United States)
- OSTI Identifier:
- 39155
- Report Number(s):
- Y/SUB-94-EAQ10C/4
ON: DE95009065; TRN: 95:009701
- DOE Contract Number:
- AC05-84OS21400
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: Oct 1994
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 54 ENVIRONMENTAL SCIENCES; 05 NUCLEAR FUELS; WATER QUALITY; MONITORING; Y-12 PLANT; SURFACE WATERS; GROUND WATER; SAMPLING
Citation Formats
. Sampling and analysis plan for groundwater and surface water monitoring at the Y-12 Plant during calendar year 1995. United States: N. p., 1994.
Web. doi:10.2172/39155.
. Sampling and analysis plan for groundwater and surface water monitoring at the Y-12 Plant during calendar year 1995. United States. https://doi.org/10.2172/39155
. 1994.
"Sampling and analysis plan for groundwater and surface water monitoring at the Y-12 Plant during calendar year 1995". United States. https://doi.org/10.2172/39155. https://www.osti.gov/servlets/purl/39155.
@article{osti_39155,
title = {Sampling and analysis plan for groundwater and surface water monitoring at the Y-12 Plant during calendar year 1995},
author = {},
abstractNote = {This plan provides a description of the groundwater and surface-water quality monitoring activities planned for calendar year (CY) 1995 at the Department of Energy Y-12 Plant. Included in this plan are the monitoring activities managed by the Y-12 Plant Health, Safety, Environment, and Accountability (HSEA) Organization through the Y-12 Plant Groundwater Protection Program (GWPP). Other groundwater and surface water monitoring activities (e.g. selected Environmental Restoration Program activities, National Pollution Discharge Elimination System (NPDES) monitoring) not managed through the Y-12 Plant GWPP are not addressed in this report. Several monitoring programs will be implemented in three hydrogeologic regimes: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located within Bear Creek Valley, and the Chestnut Ridge Regime is located south of the Y-12 Plant. For various reasons, modifications to the 1995 monitoring programs may be necessary during implementation. For example, changes in regulatory requirements may alter the parameters specified for selected wells, or wells could be added to or deleted from the monitoring network. All modifications to the monitoring programs will be approved by the Y-12 Plant GWPP manager and documented as addenda to this sampling and analysis plan.},
doi = {10.2172/39155},
url = {https://www.osti.gov/biblio/39155},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Oct 01 00:00:00 EDT 1994},
month = {Sat Oct 01 00:00:00 EDT 1994}
}