Project W-320, 241-C-106 sluicing HVAC calculations, Volume 1
This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. The report contains the following calculations: Exhaust airflow sizing for Tank 241-C-106; Equipment sizing and selection recirculation fan; Sizing high efficiency mist eliminator; Sizing electric heating coil; Equipment sizing and selection of recirculation condenser; Chiller skid system sizing and selection; High efficiency metal filter shielding input and flushing frequency; and Exhaust skid stack sizing and fan sizing.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 353332
- Report Number(s):
- HNF-2483; ON: DE99050908; BR: EW3130010; TRN: AHC29923%%164
- Resource Relation:
- Other Information: PBD: 7 Aug 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-320, 241-C-106 sluicing HVAC calculations, Volume 4
Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 6
Project W-320, 241-C-106 sluicing electrical calculations, Volume 2
Technical Report
·
Thu Jul 30 00:00:00 EDT 1998
·
OSTI ID:353332
Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 6
Technical Report
·
Fri Jul 24 00:00:00 EDT 1998
·
OSTI ID:353332
Project W-320, 241-C-106 sluicing electrical calculations, Volume 2
Technical Report
·
Fri Aug 07 00:00:00 EDT 1998
·
OSTI ID:353332