Acceptance test procedure for the L-070 project mechanical equipment and instrumentation
This document contains the acceptance test procedure for the mechanical equipment and instrumentation installed per the L-070 Project. The specific system to be tested are the pump controls for the 3906 Lift Station and 350-A Lift Station. In addition, verification that signals are being received by the 300 Area Treated Effluent Disposal Facility control system, is also performed.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 344983
- Report Number(s):
- WHC-SD-L070-ATP-001; ON: DE99050388; BR: 39EW70302; TRN: 99:004901
- Resource Relation:
- Other Information: PBD: 19 Apr 1996
- Country of Publication:
- United States
- Language:
- English
Similar Records
Acceptance test report for the L-070 project
Project W-049H instrument and control Acceptance Test Procedure
Acceptance test procedure for Project W-049H
Technical Report
·
Wed Jul 10 00:00:00 EDT 1996
·
OSTI ID:344983
Project W-049H instrument and control Acceptance Test Procedure
Technical Report
·
Wed Nov 16 00:00:00 EST 1994
·
OSTI ID:344983
Acceptance test procedure for Project W-049H
Technical Report
·
Thu Sep 29 00:00:00 EDT 1994
·
OSTI ID:344983