skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Deployment Support Leading to Implementation

Technical Report ·
DOI:https://doi.org/10.2172/2221· OSTI ID:2221

The following paragraphs summarize the progress of each research project funded under the WVU Cooperative Agreement during the third quarter of 1997 (July - September 1997). The projects are arranged according to their 1997 WVU task number. WVU Focus Area 1.0: Subsurface Contaminants, Containment and Remediation Task No. 1.1: Project discontinued. Task No. 1.2: Development of Standard Test Protocols and Barrier Design Models for Desiccation Barriers (K. Amininan & S. Ameri): A number of experiments were preformed this period to evaluate the ability of the dried sand-packs to act as a barrier to liquids. Water infiltration tests were done with a constant head, dispersing 80 ml of water, and by adding water in small increments. Results indicate that when the water is spilled over the sand-pack, it has the tendency to channel through the sand-pack, significantly reducing the capacity of the dried zone to retain liquid contaminants. This appears to be largely influenced by particle size. As the particle size is reduced, the capillary forces spread the water and prevent/delay channels from forming. The measured permeability values were in agreement with those measured with air. The water retention capacity and capillary rise were largely influenced by time and showed no sensitivity to channeling. The water retention capacity tests suggest the sand-packs can retain more water than the expected. Two sets of water infiltration and drying experiments were designed to evaluate the CAB's ability to prevent spills from spreading. Ten ml of water was injected every 20 minutes and 80 ml of water was added at one time. When injected slowly, results showed the drying process to be similar to the original drying process. The second set indicted the drying process follows a slowly declining drying with no break through. Results also suggested that air flow through the sand-pack can remove water infiltration. The air flow appeared to prevent any water channeling and thus should cause lateral distribution of the water. The large tank that accommodates the sand bed and the necessary plumbing to simulate various well configurations was received. The monitoring equipment and the sensors are currently being installed. The experimental procedures for Phase II experiments are under further investigation and will be initiated upon installation of CATC and assembly of the monitoring system. Due to insufficient operating funds, the large scale experiments will not be done this year. Task No. 1.3: Technical Support - Development of Standard Test Protocols and Barrier Design Models for In Situ Formed Barriers (B. Overbey & D. Locke, BDM Federal): The Operating Permit Renewal Request for bench scale operations in the FETC B-17 building was submitted to the FETC Lab Safety Committee for approval on 8/14/97. A review of the revised NEPA documents prepared last year indicates that these documents are still applicable for the current work. The initial design and specifications for the CATC vessel were prepared. Construction of the CATC was initiated in early July, the vessel was received August 15, 1997, and on-site work was completed this quarter.

Research Organization:
Federal Energy Technology Center, Morgantown, WV, and Pittsburgh, PA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
FC21-92MC29467
OSTI ID:
2221
Report Number(s):
DE-FC21-92MC29467-30; ON: DE00002221
Country of Publication:
United States
Language:
English