skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Waste Management Plan for the Drilling Within the Chromium Plume West of 100-D/DR Reactors

Technical Report ·
DOI:https://doi.org/10.2172/16183· OSTI ID:16183

This waste management plan provides guidance for managing drilling spoils generated during the installation of groundwater wells in the 100-D/DR Area, which is part of the 100-HR-3 Operable Unit. The wells are being installed to meet two objectives: (1) better define the nature and extent of a previously identified chromium plume in the area, and (2) act as groundwater extraction wells if the contamination warrants

Research Organization:
Bechtel Hanford Inc. (BHI), Richland, WA
Sponsoring Organization:
(US)
DOE Contract Number:
AC06-93RL-12367
OSTI ID:
16183
Report Number(s):
DOE/RL-97-53; ON: DE97053901; TRN: US0204585
Resource Relation:
Other Information: Supercedes report DE97053901; PBD: 19970721; PBD: 31 Dec 1997
Country of Publication:
United States
Language:
English

Similar Records

In situ redox manipulation treatability test -- waste management plan
Technical Report · Wed Dec 31 00:00:00 EST 1997 · OSTI ID:16183

Groundwater impact assessment report for the 100-D Ponds
Technical Report · Thu Jul 01 00:00:00 EDT 1993 · OSTI ID:16183

Rapid characterization of a chromium/trichloroethene plume using several real-time sampling and analysis technologies
Journal Article · Fri Sep 01 00:00:00 EDT 1995 · Ground Water · OSTI ID:16183