skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Vertical Magnetic Measurement System Commis-sioning and First Measurements of the First Full-Length Prototype Quadrupole Magnet for the LHC Hi-Lumi Upgrade

Journal Article · · TBD
OSTI ID:1570193

This paper will report the commissioning of the vertical magnetic measurement system and the warm (room temperature) and cold (cryogenic) magnetic field measurements of the first full-length (4.2 m) quadrupole built by the US Accelerator Upgrade Project (AUP) project (formerly the LARP collaboration) for the high luminosity upgrade of the Large Hadron Collider at CERN. The magnet, designated MQXFAP2, is a prototype preceding production for the AUP Accelerator Upgrade Project (AUP). AUP will provide ten 8.4 m superconducting insertion region (IR) quadrupoles for the Hi-Lumi Upgrade. The 8.4 m quadrupoles will be built by assembling two 4.2 m magnets in a single cryostat. Agreement between BNL’s and LBNL’s warm measurement data has indicated that the upgraded vertical magnetic measurement system at BNL is ready for MQXFA magnet production testing. The cold magnetic measurement has been performed and preliminary data analysis has been conducted. The measured data indicates that the MQXFAP2 magnet has good magnetic field which meets the preliminary MQXFA magnet acceptance criteria.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States); Argonne National Lab. (ANL), Argonne, IL (United States); Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1570193
Report Number(s):
FERMILAB-PUB-19-056-TD; oai:inspirehep.net:1758419
Journal Information:
TBD, Journal Name: TBD
Country of Publication:
United States
Language:
English

Similar Records

Vertical Magnetic Measurements of the First Full-Length Prototype MQXFAP2 Quadrupole for the LHC Hi-Lumi Accelerator Upgrade Project
Journal Article · Tue Mar 12 00:00:00 EDT 2019 · IEEE Transactions on Applied Superconductivity · OSTI ID:1570193

Test Results of the First Two Full-Length Quadrupole Magnets for the LHC Hi Lumi Upgrade
Journal Article · Wed Mar 18 00:00:00 EDT 2020 · IEEE Transactions on Applied Superconductivity · OSTI ID:1570193

Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project
Journal Article · Thu Jan 21 00:00:00 EST 2021 · IEEE Transactions on Applied Superconductivity · OSTI ID:1570193

Related Subjects