skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Design of a new main injector cavity for the Fermilab Proton Driver era

Conference ·
OSTI ID:15017201

In the design report of the Fermilab Proton Driver [1], the Main Injector (MI) needs to be upgraded to a 2 MW machine. For the Main Injector radiofrequency (rf) upgrade, R&D efforts are launched to design and build a new rf system. This paper presents the new cavity design study for the rf system. The cavity is simulated with the design code Mafia [2].

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76CH03000
OSTI ID:
15017201
Report Number(s):
FERMILAB-CONF-05-102-AD; TRN: US200606%%403
Resource Relation:
Conference: To appear in the proceedings of Particle Accelerator Conference (PAC 05), Knoxville, Tennessee, 16-20 May 2005
Country of Publication:
United States
Language:
English

Similar Records

Physics at an upgraded proton driver at Fermilab
Conference · Wed Jul 28 00:00:00 EDT 2004 · OSTI ID:15017201

2 MW upgrade of the Fermilab Main Injector
Conference · Wed Jun 04 00:00:00 EDT 2003 · OSTI ID:15017201

A search for coupled-bunch instability in the Fermilab Main Injector
Conference · Tue Jul 03 00:00:00 EDT 2001 · OSTI ID:15017201