skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: National Ignition Facility Target Chamber

Conference ·
OSTI ID:15013138

On June 11, 1999 the Department of Energy dedicated the single largest piece of the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) in Livermore, California. The ten (10) meter diameter aluminum target high vacuum chamber will serve as the working end of the largest laser in the world. The output of 192 laser beams will converge at the precise center of the chamber. The laser beams will enter the chamber in two by two arrays to illuminate 10 millimeter long gold cylinders called hohlraums enclosing 2 millimeter capsule containing deuterium, tritium and isotopes of hydrogen. The two isotopes will fuse, thereby creating temperatures and pressures resembling those found only inside stars and in detonated nuclear weapons, but on a minute scale. The NIF Project will serve as an essential facility to insure safety and reliability of our nation's nuclear arsenal as well as demonstrating inertial fusion's contribution to creating electrical power. The paper will discuss the requirements that had to be addressed during the design, fabrication and testing of the target chamber. A team from Sandia National Laboratories (SNL) and LLNL with input from industry performed the configuration and basic design of the target chamber. The method of fabrication and construction of the aluminum target chamber was devised by Pitt-Des Moines, Inc. (PDM). PDM also participated in the design of the chamber in areas such as the Target Chamber Realignment and Adjustment System, which would allow realignment of the sphere laser beams in the event of earth settlement or movement from a seismic event. During the fabrication of the target chamber the sphericity tolerances had to be addressed for the individual plates. Procedures were developed for forming, edge preparation and welding of individual plates. Construction plans were developed to allow the field construction of the target chamber to occur parallel to other NIF construction activities. This was necessary to achieve the overall schedule. Plans had to be developed for the precise location and alignment of laser beam ports. Upon completion of the fabrication of the aluminum target chamber in a temporary structure the 130 ton sphere was moved from the temporary construction enclosure to its final location in the target building. Prior to the installation of a concrete shield and after completion of the welding of the chamber penetrations vacuum leak checking was performed to insure the vacuum integrity of target chamber. The entire spherical chamber external surface supports a 40 cm thick reinforced concrete shield after installation in the target building. The final task is a total survey of the laser ports and the contour machining of spacer plates so that laser devices attached to these ports meet the alignment criteria.

Research Organization:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
15013138
Report Number(s):
UCRL-JC-141053; TRN: US0600879
Resource Relation:
Conference: 21st Space Simulation Conference, Annapolis, MD, Oct 23 - Oct 26, 2000
Country of Publication:
United States
Language:
English