skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Vadose Zone Transport Field Study: FY 2002 Test Plan

Technical Report ·
DOI:https://doi.org/10.2172/15001410· OSTI ID:15001410

The primary objective of the Vadose Zone Transport Field Study is to obtain hydrologic, geophysical, and geochemical data from controlled field studies to reduce the uncertainty in vadose-zone conceptual models and to facilitate the calibration of numerical models for water flow and contaminant transport through Hanford's heterogeneous vadose zone. A secondary objective is to evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. The study is designed to assure the measurement of flow-and-transport properties in the same soil volume, a pre-requisite for developing techniques for extrapolating parameters derived from investigations at clean representative sites to contaminated sites with minimal characterization.

Research Organization:
Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
15001410
Report Number(s):
PNNL-13857; EY3542301; TRN: US200404%%165
Country of Publication:
United States
Language:
English

Similar Records

Vadose zone transport field study: Detailed test plan for simulated leak tests
Technical Report · Fri Jun 23 00:00:00 EDT 2000 · OSTI ID:15001410

Vadose Zone Transport Field Study FY 2003 Test Plan
Technical Report · Tue Apr 15 00:00:00 EDT 2003 · OSTI ID:15001410

Vadose Zone Transport Field Study: Detailed Test Plan for Simulated Leak Tests
Technical Report · Fri Jun 23 00:00:00 EDT 2000 · OSTI ID:15001410